Call UsCall Us :
RCC Pressure Pipes

RCC Pressure Pipes

230 INR/Meter

Product Details:

  • Product Type Pressure Pipes
  • Shape Round
  • Outer Diameter 150-2400 Millimeter (mm)
  • Color Gray and White
  • Click to View more
X

RCC Pressure Pipes Price And Quantity

  • 230 INR/Meter
  • 1000 Meter

RCC Pressure Pipes Product Specifications

  • 150-2400 Millimeter (mm)
  • Pressure Pipes
  • Round
  • Gray and White

RCC Pressure Pipes Trade Information

  • 1000 Meter Per Day
  • 1-5 Days
  • All India

Product Description

RCC Pipes

We manufacture quality RCC (Reinforced cement concrete) pipes that are used for water supply schemes, drainage works, culverts and other purposes. Produced by centrifugal spinning process & tested on various parameter, all our pipes comply with IS458:2003 specifications. Our range of RCC pipes are available in different constructions such as plain type, spigot type, socket end type, tung type and groove end type.

Rao Pipes Industries take immense pleasure to announce ourselves as a pioneer in the pipe manufacturing sector. We have pioneered our manufacturing operation gradually by the fruitful experience we hold. Since our inception, we have held a commanding position in the pipe manufacturing industry. Our company has earned name in the premium segment of domestic market with its enrich experience and expertise in manufacturing superlative quality RCC Pipes to its clients. Our RCC pipes and pressure company is dedicated to specific line of product to manufacture RCC Pipes.

RCC Pipes are widely in demand for construction and plumbing purposes. These products are designed and manufactured as per the requirement of the clients. Best quality raw material is used to fabricate it. Theses pipes are corrosion resistant and are available in variegated lengths and dimensions.

Specifications :

  • Diameter: 100mm to 2000mm
  • Class: NP2, NP3, NP4, PI, P2

Applications:

  • For effluent discharge in sewerage
  • For agricultural purposes
  • For storm water drainage
  • As road culverts and cross drainage
  • As water mains for supply
  • Used for cistern and pump houses

 Manufacturing Process of RCC Hume/Spun Pipes

Caging:
1st of all reinforcement cages are fabricated on collapsible drum type cage machines. All cages are separately weighted on Electronic weigh. Supervisor makes it sure that all cages are as per IS: 458. All cages are tagged with weights and according to tag nos. there weights are written down on the black Board. Quality In charge randomly checks the weigh of some cages for accuracy. All cages weights are note down in Daily Production sheet with their tag nos. and are given a specific code no.

Mixture: According to mix design and regular checking aggregates, water and Cement are used by weight. Instructions are written on boards for proper mixtures. Instructions are given to consume mixture within 30 minutes for its proper strength. IS 456 is followed for this.

Molding: All moulds are properly cleaned from Hand Grinder after opening. Proper supports are given for centering of cages. {If it is higher dia 2 cages are made as per IS: 458 and upper cage is always 75% of inner cage} Proper oiling is done on moulds as well as on bushes and rings. These are properly packed with tie rods and nut-bolts.

Manufacturing: After molding moulds are properly kept on runners with the help of Chain Pulleys. Initially while pouring the mixture RPM of machine is very slow for proper pouring and than RPM are up to 1500 as per the requirement of IS: 458. When the proper spinning is done it leaves extra water which gives the strength to the pipe. After it, finishing of pipes is done by cutting from rods and brushes.

Demolding: While demolding, with the help of Chain pulleys moulds are separated. Moulds are demoulded after 24 hours for proper quality of pipes.

Marking: After manufacturing process, all pipes are marked and dated from permanent marker. Supervisor record all these marked numbers in front of tagged numbers and after wards these are stored in Computer by date and marked number wise with the weigh of cages.

Curing: After Demoulding with the help of Trolleys, Hydra and ceilings pipes are kept in curing tanks for proper curing. Rotation of pipes is done daily and 24 hours Sprinklers are on. After 28 days curing pipes are taken out from tanks and storage is done.

Enter Buying Requirement Details
Email Id
Mobile number

Other Products in 'RCC Pipes' category